The BIM model. Tanker unloading area

I108
576,00
m2
A BIM model for the reconstruction of the tanker unloading area. The digital model was developed to verify design solutions and coordinate the project with the plant's operating services. The model also helped with the assessment of the operation of technological equipment designed for emptying tanks.

3D model
Made on
Tilda